Year: 2021
Client: Gavà, L’Hospitalet de Llobregat, Malgrat de Mar, Palau Solità i Plegamans, Parets del Vallès, Sabadell and Sant Boi de Llobregat city halls. And 4 Departments of the Generalitat.
Client: Gavà, L’Hospitalet de Llobregat, Malgrat de Mar, Palau Solità i Plegamans, Parets del Vallès, Sabadell and Sant Boi de Llobregat city halls. And 4 Departments of the Generalitat.
VI RE-M MARATHON OF ENERGY SAVINGS
Objective: Save on the consumption of different buildings owned by the municipality and raise awareness among users and responsible people about energy poverty.

Proposal: Sixth edition of the ENERGY SAVING MARATHON: Reduce, during the month of February 2021, the consumption of water, electricity and gas of different equipment compared to the same period of the previous year. To allocate the energy savings that have been achieved in the fight against energy poverty
Sixth edition of the ENERGY SAVING MARATHON
