Year: 2023
Client: Barcelona, Granollers, L’Hospitalet de Llobregat, Lleida, Malgrat de Mar, Parets del Vallès and Sant Boi de Llobregat city halls and ZER Poblet.
Client: Barcelona, Granollers, L’Hospitalet de Llobregat, Lleida, Malgrat de Mar, Parets del Vallès and Sant Boi de Llobregat city halls and ZER Poblet.
8th MARATHON RE-M OF ENERGY SAVINGS
Objective: Save on the consumption of different buildings owned by the municipality and raise awareness among users and responsible people about energy poverty.

Proposal: Reduce, during the month of February 2023, the consumption of water, electricity and gas of different equipment compared to the same period of the previous year. To allocate the economic savings that have been achieved in the fight against energy poverty and climate change.
8th MARATHON RE-M OF ENERGY SAVINGS
